Boeing sees 787 airborne in weeks; timetable questioned

Monday, 18 March 2013 00:00 -     - {{hitsCtrl.values.hits}}

Reuters: Boeing Co said Friday its 787 Dreamliner jets could be airborne within weeks using a new battery system that includes safeguards against overheating, a prediction that drew scepticism from some regulators and industry experts.

Japanese regulators immediately warned that the timetable was impossible to predict, in part because investigators still do not know what had caused lithium-ion batteries to overheat on two 787s.



“At this time we are not yet in a position to say when flights will restart,” said Shigeru Takano, the air transport safety director at Japan’s Civil Aviation Board (CAB), which will assess and approve Boeing’s proposed fix.

Boeing’s confident assertion marked a shift from the May or June dates expected by airlines, and appeared to pressure regulators to quickly approve the new battery safeguards. Industry sources said US regulators have signalled they expect a lengthy testing schedule sufficient to ensure the refitted, carbon-composite plane is safe.

Boeing’s timetable also put the company at risk of missing a deadline if approval takes longer than expected, adding to a history of missed deadlines that has bedevilled the Dreamliner.

Regulators grounded Dreamliners worldwide in January after a battery caught fire on a Japan Airlines Co 787 jet at Boston’s Logan airport and a battery melted on an All Nippon Airways Co (9202.T) flight in Japan.

On Tuesday, the Federal Aviation Administration (FAA) approved Boeing’s plan to test its new battery system for certification. The agency had no comment on Boeing’s new timetable on Friday.

In explaining its optimism, Boeing said it had finished three tests of the new battery system and was performing three more this week, all in cooperation with the FAA, allowing it to predict the plane would be back in the air in weeks, not months.

“We should be able to finish those tests in the next week or two,” Ron Hinderberger, Vice President of 787-8 Engineering for Boeing Commercial Airplanes, told a US press conference on Friday. Once the tests are finished, it will be up to the FAA to approve the process, Hinderberger added.

To meet regulators’ standards and ensure safety, Boeing said it will encase the redesigned battery in a steel box, pack it with added insulation, heat-resistant material and spacers, and provide drainage holes to remove moisture and vent any gases from overheating directly outside the aircraft.

COMMENTS